{"id":2229,"date":"2026-02-09T09:31:28","date_gmt":"2026-02-09T09:31:28","guid":{"rendered":"https:\/\/totalenvironmentindia.com\/blog\/?p=2229"},"modified":"2026-02-09T09:31:30","modified_gmt":"2026-02-09T09:31:30","slug":"chennai-bangalore-expressway","status":"publish","type":"post","link":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/","title":{"rendered":"Chennai Bangalore Expressway: Route, Map, Connectivity &amp; More"},"content":{"rendered":"\n<p>The Chennai Bangalore Expressway is among the most ambitious greenfield highway infrastructure projects undertaken in South India in recent years. The expressway will create a high-speed route that connects Chennai and Bangalore (Bengaluru) with restricted access, which will shorten travel times while improving freight operations, and driving economic and real estate growth across three states.<\/p>\n\n\n\n<p>The National Highways Authority of India (NHAI) executed the project under the Bharatmala Pariyojana, which represents a shift from using traditional highways to modern expressway systems.&nbsp;<\/p>\n\n\n\n<p>The new highway between Bangalore and Chennai will serve as a crucial transportation route, enabling industrial growth, logistics operations, and inter-city travel throughout southern India.<\/p>\n\n\n\n<p><strong>See also: <a href=\"https:\/\/totalenvironmentindia.com\/blog\/real-estate-investment-in-bangalore\/\">Real Estate Investment in Bangalore: A Complete Guide<\/a><\/strong><\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_76 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Background_and_Evolution_of_the_Chennai_Bangalore_Expressway\" >Background and Evolution of the Chennai Bangalore Expressway<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Overview_of_the_Chennai_Bangalore_Expressway_Project\" >Overview of the Chennai Bangalore Expressway Project<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Key_Project_Specifications\" >Key Project Specifications<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Strategic_Importance_of_the_Bangalore_to_Chennai_New_Highway\" >Strategic Importance of the Bangalore to Chennai New Highway<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Chennai_Bangalore_Expressway_Route_and_Connectivity\" >Chennai Bangalore Expressway Route and Connectivity<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Existing_Routes_vs_New_Alignment\" >Existing Routes vs New Alignment<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Chennai_Bangalore_Expressway_Route_Details\" >Chennai Bangalore Expressway Route Details<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Karnataka\" >Karnataka:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Andhra_Pradesh\" >Andhra Pradesh:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Tamil_Nadu\" >Tamil Nadu:<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Chennai_Bangalore_Expressway_Route_Map\" >Chennai Bangalore Expressway Route Map<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Spur_Roads_and_Auxiliary_Connections\" >Spur Roads and Auxiliary Connections<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Approved_and_Proposed_Spur_Roads\" >Approved and Proposed Spur Roads<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Spur_1\" >Spur 1:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Spur_2\" >Spur 2:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Spur_3\" >Spur 3:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Spur_4\" >Spur 4:<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Project_Cost_and_Financial_Structure\" >Project Cost and Financial Structure<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Phase-Wise_Construction_Status\" >Phase-Wise Construction Status<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Phase_1_Karnataka_Operational\" >Phase 1: Karnataka (Operational)<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Packages_%E2%80%93_Karnataka\" >Packages \u2013 Karnataka<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Phase_2_Andhra_Pradesh_Tamil_Nadu\" >Phase 2: Andhra Pradesh &amp; Tamil Nadu<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Packages_%E2%80%93_Phase_2\" >Packages \u2013 Phase 2<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Phase_3_Tamil_Nadu\" >Phase 3: Tamil Nadu<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Infrastructure_includes\" >Infrastructure includes:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Packages_%E2%80%93_Phase_3\" >Packages \u2013 Phase 3<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Timeline_of_Key_Milestones\" >Timeline of Key Milestones<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Toll_Charges_on_the_Chennai_Bangalore_Expressway\" >Toll Charges on the Chennai Bangalore Expressway<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Cars_and_Jeeps\" >Cars and Jeeps<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Real_Estate_and_Economic_Impact\" >Real Estate and Economic Impact<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-31\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Sriperumbudur\" >Sriperumbudur<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-32\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Hoskote_Devanahalli\" >Hoskote &amp; Devanahalli<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-33\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#Future_Expansion_Plans_Chennai_Bangalore_Expressway\" >Future Expansion Plans: Chennai Bangalore Expressway<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-34\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#FAQs\" >FAQ\u2019s<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Background_and_Evolution_of_the_Chennai_Bangalore_Expressway\"><\/span><strong>Background and Evolution of the Chennai Bangalore Expressway<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The first mention of a high-speed road corridor between Chennai and Bengaluru occurred during P. Chidambaram&#8217;s Union Budget speech in 1990. The proposal experienced no progress during that period because technical, financial and administrative challenges blocked its advancement.<\/p>\n\n\n\n<p>The project officially restarted in 2018 when the National Highways Authority of India (NHAI) began land acquisition activities. The construction work for one of South India&#8217;s biggest highway projects started in 2019. The corridor received its official designation as National Expressway 7 (NE-7) in January 2021.<\/p>\n\n\n\n<p><strong>See also: <a href=\"https:\/\/totalenvironmentindia.com\/blog\/most-developing-areas-in-bangalore\/\">10 Most Developing Areas in Bangalore: Best Investment &amp; Living Locations<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Overview_of_the_Chennai_Bangalore_Expressway_Project\"><\/span><strong>Overview of the Chennai Bangalore Expressway Project<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Chennai Bangalore Expressway is being developed as a four-lane access-controlled highway, with provisions for future expansion to eight lanes. The road network will have a speed limit of 120 kilometres per hour, which will enable it to provide better connections between the two cities than the current road systems do.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Project_Specifications\"><\/span><strong>Key Project Specifications<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Parameter<\/strong><\/td><td><strong>Details<\/strong><\/td><\/tr><tr><td>Total Length<\/td><td>258 km<\/td><\/tr><tr><td>Project Cost<\/td><td>Approx. INR 18,000 crore<\/td><\/tr><tr><td>Start Point<\/td><td>Hoskote, Karnataka<\/td><\/tr><tr><td>End Point<\/td><td>Sriperumbudur, Tamil Nadu<\/td><\/tr><tr><td>Alternate Name<\/td><td>National Expressway 7 (NE-7)<\/td><\/tr><tr><td>Lanes<\/td><td>4 (Expandable to 8)<\/td><\/tr><tr><td>Speed Limit<\/td><td>120 km\/h<\/td><\/tr><tr><td>Land Required<\/td><td>~2,560 hectares<\/td><\/tr><tr><td>States Covered<\/td><td>Karnataka, Andhra Pradesh, Tamil Nadu<\/td><\/tr><tr><td>Project Model<\/td><td>Hybrid Annuity Model<\/td><\/tr><tr><td>Underpasses<\/td><td>41<\/td><\/tr><tr><td>Flyovers<\/td><td>17<\/td><\/tr><tr><td>Current Status<\/td><td>Partially Operational<\/td><\/tr><tr><td>Expected Completion<\/td><td>July 2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Strategic_Importance_of_the_Bangalore_to_Chennai_New_Highway\"><\/span><strong>Strategic Importance of the Bangalore to Chennai New Highway<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>People travel between Bengaluru and Chennai through two main routes, which include NH-48 (Golden Quadrilateral) and Old Madras Road. The new expressway will reduce this travel time to approximately 2 hours and 15 minutes, while also shortening the overall distance by nearly 80 kilometres.<\/p>\n\n\n\n<p>The expressway directly supports the Chennai\u2013Bengaluru Industrial Corridor, which enhances supply chain operations and enables quicker freight transport and better connectivity to ports, manufacturing areas and logistics centers.<\/p>\n\n\n\n<p><strong>See also: <a href=\"https:\/\/totalenvironmentindia.com\/blog\/hennur-main-road-bangalore\/\">Hennur Main Road Bangalore: Real Estate Guide<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Chennai_Bangalore_Expressway_Route_and_Connectivity\"><\/span><strong>Chennai Bangalore Expressway Route and Connectivity<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Existing_Routes_vs_New_Alignment\"><\/span><strong>Existing Routes vs New Alignment<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Chennai and Bengaluru are linked by three primary highways, which include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hosur to Krishnagiri route, which uses the Golden Quadrilateral and NH-48.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Old Madras Road route<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Kolar to KGF to Vellore route<\/li>\n<\/ul>\n\n\n\n<p>NH-48 serves as the primary highway which people use for travelling between Chennai and Bangalore because it runs for almost 380 kilometres. The Chennai Bangalore Expressway provides a better route, which takes less time and travels at greater safety because it has fewer entry points and uses modern safety features.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Chennai_Bangalore_Expressway_Route_Details\"><\/span><strong>Chennai Bangalore Expressway Route Details<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The highway system extends through three different states while it connects multiple important urban areas and vital business hubs.&nbsp;<\/p>\n\n\n\n<p><strong>Major Locations Along the Route<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Karnataka\"><\/span><strong>Karnataka:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Hoskote, Malur, Bangarapet, Kolar Gold Fields<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Andhra_Pradesh\"><\/span><strong>Andhra Pradesh:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Venkatagirikota (V Kota), Palamaner, Bangarupalem, Chittoor<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tamil_Nadu\"><\/span><strong>Tamil Nadu:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Gudiyatham, Ranipet, Arakkonam, Sriperumbudur<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Chennai_Bangalore_Expressway_Route_Map\"><\/span><strong>Chennai Bangalore Expressway Route Map<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Chennai Bangalore Expressway route map highlights a linear access control system which allows vehicles to bypass all urban areas. The interchange system provides necessary connections between different locations while maintaining high speeds of vehicle movement throughout the entire system.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Spur_Roads_and_Auxiliary_Connections\"><\/span><strong>Spur Roads and Auxiliary Connections<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The expressway system includes spur routes, which create additional access points between the main corridor and the existing highway network.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Approved_and_Proposed_Spur_Roads\"><\/span><strong>Approved and Proposed Spur Roads<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Spur_1\"><\/span><strong>Spur 1:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p>The expressway stretches for 95.63 kilometres to connect with NH-4 at Dobbaspet.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Spur_2\"><\/span><strong>Spur 2:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p>The route extends for 3.58 kilometres to connect with NH-4 at Konadasapura, situated to the east of Bengaluru.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Spur_3\"><\/span><strong>Spur 3:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p>The route extends for 6.47 kilometres to provide access to Kolar Gold Fields.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Spur_4\"><\/span><strong>Spur 4:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p>The proposed link extends for 7.44 kilometres toward Katpadi.<\/p>\n\n\n\n<p><strong>See also: <a href=\"https:\/\/totalenvironmentindia.com\/blog\/gst-on-real-estate\/\">What Is GST on Real Estate and How Does It Apply in 2026?<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Project_Cost_and_Financial_Structure\"><\/span><strong>Project Cost and Financial Structure<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The total estimated cost of the Chennai Bangalore Expressway stands at INR 18,000 crore. The allocation includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The core construction part of the project receives funding of approximately INR 5,700 crore.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The remaining budget funds land acquisition expenses, toll system costs, administrative expenses and utility relocation work.<\/li>\n<\/ul>\n\n\n\n<p>The project execution follows the Hybrid Annuity Model, which creates a funding balance between government support and private sector investment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Phase-Wise_Construction_Status\"><\/span><strong>Phase-Wise Construction Status<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Phase_1_Karnataka_Operational\"><\/span><strong>Phase 1: Karnataka (Operational)<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Length:<\/strong> ~71 km<br><\/li>\n\n\n\n<li><strong>Opened:<\/strong> December 2024<br><\/li>\n<\/ul>\n\n\n\n<p><strong>This section includes:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>15 major bridges<br><\/li>\n\n\n\n<li>47 minor bridges<br><\/li>\n\n\n\n<li>63 underpasses<br><\/li>\n\n\n\n<li>4 toll plazas<br><\/li>\n\n\n\n<li>1 truck lay-by<\/li>\n<\/ul>\n\n\n\n<p>The main delay during this stage happened because workers needed to move a temple which stood on the 400-meter section of Jinnagara Circle situated in Hoskote.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Packages_%E2%80%93_Karnataka\"><\/span><strong>Packages \u2013 Karnataka<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Package<\/strong><\/td><td><strong>Length<\/strong><\/td><td><strong>Status<\/strong><\/td><td><strong>Contractor<\/strong><\/td><\/tr><tr><td>Hoskote \u2013 Malur<\/td><td>26.4 km<\/td><td>Complete<\/td><td>Dilip Buildcon<\/td><\/tr><tr><td>Malur \u2013 Bangarapet<\/td><td>27.1 km<\/td><td>Complete<\/td><td>Dilip Buildcon<\/td><\/tr><tr><td>Bangarapet \u2013 Bethamangala<\/td><td>17.5 km<\/td><td>Complete<\/td><td>KCC Buildcon<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Phase_2_Andhra_Pradesh_Tamil_Nadu\"><\/span><strong>Phase 2: Andhra Pradesh &amp; Tamil Nadu<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Length:<\/strong> ~85 km<br><\/li>\n\n\n\n<li><strong>Current Progress:<\/strong> ~40% overall<br><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Packages_%E2%80%93_Phase_2\"><\/span><strong>Packages \u2013 Phase 2<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Package<\/strong><\/td><td><strong>Length<\/strong><\/td><td><strong>Progress<\/strong><\/td><td><strong>Contractor<\/strong><\/td><\/tr><tr><td>Bethamangala \u2013 Baireddipalle<\/td><td>25 km<\/td><td>85.90%<\/td><td>Montecarlo<\/td><\/tr><tr><td>Baireddipalle \u2013 Bangarupalem<\/td><td>31 km<\/td><td>64.05%<\/td><td>APCO Infratech<\/td><\/tr><tr><td>Bangarupalem \u2013 Gudipala<\/td><td>29 km<\/td><td>97.04%<\/td><td>Dilip Buildcon<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Phase_3_Tamil_Nadu\"><\/span><strong>Phase 3: Tamil Nadu<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Length:<\/strong> ~106.1 km<br><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Infrastructure_includes\"><\/span><strong>Infrastructure includes:<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>34 major bridges<br><\/li>\n\n\n\n<li>31 minor bridges<br><\/li>\n\n\n\n<li>3 rail overbridges<br><\/li>\n\n\n\n<li>3 interchanges<br><\/li>\n\n\n\n<li>3 rest areas<br><\/li>\n\n\n\n<li>2 truck lay-bys<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Packages_%E2%80%93_Phase_3\"><\/span><strong>Packages \u2013 Phase 3<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Package<\/strong><\/td><td><strong>Length<\/strong><\/td><td><strong>Progress<\/strong><\/td><td><strong>Contractor<\/strong><\/td><\/tr><tr><td>Gudipala \u2013 Walajapet<\/td><td>24 km<\/td><td>95.00%<\/td><td>Montecarlo<\/td><\/tr><tr><td>Walajapet \u2013 Arakkonam<\/td><td>24.5 km<\/td><td>95.00%<\/td><td>KCC Buildcon<\/td><\/tr><tr><td>Arakkonam \u2013 Kanchipuram<\/td><td>25.5 km<\/td><td>50.00%<\/td><td>DP Jain Infra<\/td><\/tr><tr><td>Kanchipuram \u2013 Sriperumbudur<\/td><td>32.1 km<\/td><td>70%<\/td><td>RCC<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>The three main packages have reached almost complete work with 90% progress. The concessionaire&#8217;s financial difficulties have caused one package to experience delays.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Timeline_of_Key_Milestones\"><\/span><strong>Timeline of Key Milestones<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Year<\/strong><\/td><td><strong>Milestone<\/strong><\/td><\/tr><tr><td>1990s<\/td><td>First announced<\/td><\/tr><tr><td>2018<\/td><td>Land acquisition initiated<\/td><\/tr><tr><td>2019<\/td><td>Construction commenced<\/td><\/tr><tr><td>2020<\/td><td>2,560 hectares acquired<\/td><\/tr><tr><td>2021<\/td><td>Contractors appointed<\/td><\/tr><tr><td>2023<\/td><td>Eight-lane provision announced<\/td><\/tr><tr><td>2024<\/td><td>The Karnataka stretch opened<\/td><\/tr><tr><td>2026<\/td><td>Expected full completion (July)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Toll_Charges_on_the_Chennai_Bangalore_Expressway\"><\/span><strong>Toll Charges on the Chennai Bangalore Expressway<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Cars_and_Jeeps\"><\/span><strong>Cars and Jeeps<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Trip Type<\/strong><\/td><td><strong>Toll (INR)<\/strong><\/td><\/tr><tr><td>One-way<\/td><td>185\u2013190<\/td><\/tr><tr><td>Same-day return<\/td><td>275\u2013280<\/td><\/tr><tr><td>Monthly pass (50 trips)<\/td><td>6,105\u20136,260<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Heavy vehicles may pay a toll fee, which amounts to INR 635 for a one-way trip and INR 955 for a round trip.<\/p>\n\n\n\n<p><strong>The toll plazas can be found at these locations:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hedigenabele<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Agrahara<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Krishnarajapura<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Sundarapalya<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Real_Estate_and_Economic_Impact\"><\/span><strong>Real Estate and Economic Impact<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Real-Estate-and-Economic-Impact-1024x538.webp\" alt=\"Chennai Bangalore Expressway: Real Estate and Economic Impact\" class=\"wp-image-2234\" srcset=\"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Real-Estate-and-Economic-Impact-1024x538.webp 1024w, https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Real-Estate-and-Economic-Impact-980x515.webp 980w, https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Real-Estate-and-Economic-Impact-480x252.webp 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sriperumbudur\"><\/span><strong>Sriperumbudur<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Sale prices: INR 3,500 \u2013 5,500 per sq. ft.<br><\/li>\n\n\n\n<li>Rentals: INR 8 \u2013 15 per sq. ft.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Hoskote_Devanahalli\"><\/span><strong>Hoskote &amp; Devanahalli<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The proposed cloverleaf interchange, together with its connectivity plan, will increase the need for both residential and plotted development <strong><a href=\"https:\/\/www.totalenvironmentindia.com\/\">projects<\/a><\/strong>.\u00a0<\/p>\n\n\n\n<p>The corridor&#8217;s ribbon development will create two major impacts, which include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Industrial expansion<br><\/li>\n\n\n\n<li>Employment creation<br><\/li>\n\n\n\n<li>Stable rental demand<\/li>\n<\/ul>\n\n\n\n<p><strong>See also: <a href=\"https:\/\/totalenvironmentindia.com\/blog\/gated-communities-in-bangalore\/\">Are Gated Communities in Bangalore the Future of Urban Living?<\/a><\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Future_Expansion_Plans_Chennai_Bangalore_Expressway\"><\/span><strong>Future Expansion Plans: Chennai Bangalore Expressway<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The expressway will be expanded to Mangaluru after its construction ends, which will improve east-west transportation links throughout southern India, according to MoRTH and NHAI regulations.<\/p>\n\n\n\n<p>Overall, the Chennai Bangalore Expressway serves as an infrastructure project which will transform South Indian transportation systems, economic development and urban expansion. The expressway will become a major transportation corridor in India because it combines fast travel with safe operation and important roadway connections.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs\"><\/span><strong>FAQ\u2019s<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1770618868441\"><strong class=\"schema-faq-question\">Q1. Is the Chennai Bangalore Expressway open?<\/strong> <p class=\"schema-faq-answer\">The Karnataka section, which measures approximately 71 kilometers is currently active while construction work continues on the rest of the project, which will reach its complete operational status in July 2026.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1770618945031\"><strong class=\"schema-faq-question\">Q2. Which two cities will the Bangalore Chennai Expressway connect?<\/strong> <p class=\"schema-faq-answer\">The route provides a connection between Bengaluru through Hoskote and Chennai through Sriperumbudur.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1770618980562\"><strong class=\"schema-faq-question\">Q3. What is the length of Chennai Bangalore Expressway ?<\/strong> <p class=\"schema-faq-answer\">The Chennai Bangalore Expressway extends for a distance of about 258 kilometres.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1770619023615\"><strong class=\"schema-faq-question\">Q4. Where to enter Bangalore Chennai Expressway?<\/strong> <p class=\"schema-faq-answer\">The main points of entry into the area are situated at Hoskote, which is close to Bengaluru and at Sriperumbudur, which is near Chennai, together with specific interchanges that are distributed throughout the entire route.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1770619050038\"><strong class=\"schema-faq-question\">Q5. What are the toll charges on the Chennai Bangalore Expressway?<\/strong> <p class=\"schema-faq-answer\">In the Karnataka stretch, cars and jeeps must pay toll fees that begin at approximately \u20b9185 to \u20b9190 for a single journey, while larger vehicles and those using return trips or monthly passes must pay higher toll rates.<\/p> <\/div> <\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Chennai Bangalore Expressway is among the most ambitious greenfield highway infrastructure projects undertaken in South India in recent years. The expressway will create a high-speed route that connects Chennai and Bangalore (Bengaluru) with restricted access, which will shorten travel times while improving freight operations, and driving economic and real estate growth across three states. [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":2233,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"<!-- wp:paragraph -->\n<p>The Chennai Bangalore Expressway is among the most ambitious greenfield highway infrastructure projects undertaken in South India in recent years. The expressway will create a high-speed route that connects Chennai and Bangalore (Bengaluru) with restricted access, which will shorten travel times while improving freight operations, and driving economic and real estate growth across three states.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The National Highways Authority of India (NHAI) executed the project under the Bharatmala Pariyojana, which represents a shift from using traditional highways to modern expressway systems.&nbsp;<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The new highway between Bangalore and Chennai will serve as a crucial transportation route, enabling industrial growth, logistics operations, and inter-city travel throughout southern India.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Background and Evolution of the Chennai Bangalore Expressway<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>The first mention of a high-speed road corridor between Chennai and Bengaluru occurred during P. Chidambaram's Union Budget speech in 1990. The proposal experienced no progress during that period because technical, financial and administrative challenges blocked its advancement.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The project officially restarted in 2018 when the National Highways Authority of India (NHAI) began land acquisition activities. The construction work for one of South India's biggest highway projects started in 2019. The corridor received its official designation as National Expressway 7 (NE-7) in January 2021.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Overview of the Chennai Bangalore Expressway Project<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>The Chennai Bangalore Expressway is being developed as a four-lane access-controlled highway, with provisions for future expansion to eight lanes. The road network will have a speed limit of 120 kilometres per hour, which will enable it to provide better connections between the two cities than the current road systems do.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3 class=\"wp-block-heading\"><strong>Key Project Specifications<\/strong><\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:table -->\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Parameter<\/strong><\/td><td><strong>Details<\/strong><\/td><\/tr><tr><td>Total Length<\/td><td>258 km<\/td><\/tr><tr><td>Project Cost<\/td><td>Approx. INR 18,000 crore<\/td><\/tr><tr><td>Start Point<\/td><td>Hoskote, Karnataka<\/td><\/tr><tr><td>End Point<\/td><td>Sriperumbudur, Tamil Nadu<\/td><\/tr><tr><td>Alternate Name<\/td><td>National Expressway 7 (NE-7)<\/td><\/tr><tr><td>Lanes<\/td><td>4 (Expandable to 8)<\/td><\/tr><tr><td>Speed Limit<\/td><td>120 km\/h<\/td><\/tr><tr><td>Land Required<\/td><td>~2,560 hectares<\/td><\/tr><tr><td>States Covered<\/td><td>Karnataka, Andhra Pradesh, Tamil Nadu<\/td><\/tr><tr><td>Project Model<\/td><td>Hybrid Annuity Model<\/td><\/tr><tr><td>Underpasses<\/td><td>41<\/td><\/tr><tr><td>Flyovers<\/td><td>17<\/td><\/tr><tr><td>Current Status<\/td><td>Partially Operational<\/td><\/tr><tr><td>Expected Completion<\/td><td>July 2026<\/td><\/tr><\/tbody><\/table><\/figure>\n<!-- \/wp:table -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Strategic Importance of the Bangalore to Chennai New Highway<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>People travel between Bengaluru and Chennai through two main routes, which include NH-48 (Golden Quadrilateral) and Old Madras Road. The new expressway will reduce this travel time to approximately 2 hours and 15 minutes, while also shortening the overall distance by nearly 80 kilometres.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The expressway directly supports the Chennai\u2013Bengaluru Industrial Corridor, which enhances supply chain operations and enables quicker freight transport and better connectivity to ports, manufacturing areas and logistics centers.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Chennai Bangalore Expressway Route and Connectivity<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3 class=\"wp-block-heading\"><strong>Existing Routes vs New Alignment<\/strong><\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>Chennai and Bengaluru are linked by three primary highways, which include:<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>Hosur to Krishnagiri route, which uses the Golden Quadrilateral and NH-48.<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>The Old Madras Road route<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>The Kolar to KGF to Vellore route<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:paragraph -->\n<p>NH-48 serves as the primary highway which people use for travelling between Chennai and Bangalore because it runs for almost 380 kilometres. The Chennai Bangalore Expressway provides a better route, which takes less time and travels at greater safety because it has fewer entry points and uses modern safety features.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Chennai Bangalore Expressway Route Details<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>The highway system extends through three different states while it connects multiple important urban areas and vital business hubs.&nbsp;<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Major Locations Along the Route<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3 class=\"wp-block-heading\"><strong>Karnataka:<\/strong><\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>Hoskote, Malur, Bangarapet, Kolar Gold Fields<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Andhra Pradesh:<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>Venkatagirikota (V Kota), Palamaner, Bangarupalem, Chittoor<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Tamil Nadu:<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>Gudiyatham, Ranipet, Arakkonam, Sriperumbudur<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Chennai Bangalore Expressway Route Map<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>The Chennai Bangalore Expressway route map highlights a linear access control system which allows vehicles to bypass all urban areas. The interchange system provides necessary connections between different locations while maintaining high speeds of vehicle movement throughout the entire system.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Spur Roads and Auxiliary Connections<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>The expressway system includes spur routes, which create additional access points between the main corridor and the existing highway network.&nbsp;<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Approved and Proposed Spur Roads<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><br><strong>Spur 1:<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The expressway stretches for 95.63 kilometres to connect with NH-4 at Dobbaspet.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Spur 2:<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The route extends for 3.58 kilometres to connect with NH-4 at Konadasapura, situated to the east of Bengaluru.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Spur 3:<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The route extends for 6.47 kilometres to provide access to Kolar Gold Fields.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Spur 4:<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The proposed link extends for 7.44 kilometres toward Katpadi.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Project Cost and Financial Structure<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>The total estimated cost of the Chennai Bangalore Expressway stands at INR 18,000 crore. The allocation includes:<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>The core construction part of the project receives funding of approximately INR 5,700 crore.<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>The remaining budget funds land acquisition expenses, toll system costs, administrative expenses and utility relocation work.<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:paragraph -->\n<p>The project execution follows the Hybrid Annuity Model, which creates a funding balance between government support and private sector investment.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Phase-Wise Construction Status<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3 class=\"wp-block-heading\"><strong>Phase 1: Karnataka (Operational)<\/strong><\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li><strong>Length:<\/strong> ~71 km<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><strong>Opened:<\/strong> December 2024<br><\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:paragraph -->\n<p>This section includes:<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>15 major bridges<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>47 minor bridges<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>63 underpasses<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>4 toll plazas<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>1 truck lay-by<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:paragraph -->\n<p>The main delay during this stage happened because workers needed to move a temple which stood on the 400-meter section of Jinnagara Circle situated in Hoskote.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading {\"level\":4} -->\n<h4 class=\"wp-block-heading\"><strong>Packages \u2013 Karnataka<\/strong><\/h4>\n<!-- \/wp:heading -->\n\n<!-- wp:table -->\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Package<\/strong><\/td><td><strong>Length<\/strong><\/td><td><strong>Status<\/strong><\/td><td><strong>Contractor<\/strong><\/td><\/tr><tr><td>Hoskote \u2013 Malur<\/td><td>26.4 km<\/td><td>Complete<\/td><td>Dilip Buildcon<\/td><\/tr><tr><td>Malur \u2013 Bangarapet<\/td><td>27.1 km<\/td><td>Complete<\/td><td>Dilip Buildcon<\/td><\/tr><tr><td>Bangarapet \u2013 Bethamangala<\/td><td>17.5 km<\/td><td>Complete<\/td><td>KCC Buildcon<\/td><\/tr><\/tbody><\/table><\/figure>\n<!-- \/wp:table -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3 class=\"wp-block-heading\"><strong>Phase 2: Andhra Pradesh &amp; Tamil Nadu<\/strong><\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li><strong>Length:<\/strong> ~85 km<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li><strong>Current Progress:<\/strong> ~40% overall<br><\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:paragraph -->\n<p><strong>Packages \u2013 Phase 2<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:table -->\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Package<\/strong><\/td><td><strong>Length<\/strong><\/td><td><strong>Progress<\/strong><\/td><td><strong>Contractor<\/strong><\/td><\/tr><tr><td>Bethamangala \u2013 Baireddipalle<\/td><td>25 km<\/td><td>85.90%<\/td><td>Montecarlo<\/td><\/tr><tr><td>Baireddipalle \u2013 Bangarupalem<\/td><td>31 km<\/td><td>64.05%<\/td><td>APCO Infratech<\/td><\/tr><tr><td>Bangarupalem \u2013 Gudipala<\/td><td>29 km<\/td><td>97.04%<\/td><td>Dilip Buildcon<\/td><\/tr><\/tbody><\/table><\/figure>\n<!-- \/wp:table -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3 class=\"wp-block-heading\"><strong>Phase 3: Tamil Nadu<\/strong><\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li><strong>Length:<\/strong> ~106.1 km<br><\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:paragraph -->\n<p><strong>Infrastructure includes:<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>34 major bridges<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>31 minor bridges<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>3 rail overbridges<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>3 interchanges<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>3 rest areas<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>2 truck lay-bys<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:paragraph -->\n<p><strong>Packages \u2013 Phase 3<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:table -->\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Package<\/strong><\/td><td><strong>Length<\/strong><\/td><td><strong>Progress<\/strong><\/td><td><strong>Contractor<\/strong><\/td><\/tr><tr><td>Gudipala \u2013 Walajapet<\/td><td>24 km<\/td><td>95.00%<\/td><td>Montecarlo<\/td><\/tr><tr><td>Walajapet \u2013 Arakkonam<\/td><td>24.5 km<\/td><td>95.00%<\/td><td>KCC Buildcon<\/td><\/tr><tr><td>Arakkonam \u2013 Kanchipuram<\/td><td>25.5 km<\/td><td>50.00%<\/td><td>DP Jain Infra<\/td><\/tr><tr><td>Kanchipuram \u2013 Sriperumbudur<\/td><td>32.1 km<\/td><td>70%<\/td><td>RCC<\/td><\/tr><\/tbody><\/table><\/figure>\n<!-- \/wp:table -->\n\n<!-- wp:paragraph -->\n<p>The three main packages have reached almost complete work with 90% progress. The concessionaire's financial difficulties have caused one package to experience delays.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>Timeline of Key Milestones<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:table -->\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Year<\/strong><\/td><td><strong>Milestone<\/strong><\/td><\/tr><tr><td>1990s<\/td><td>First announced<\/td><\/tr><tr><td>2018<\/td><td>Land acquisition initiated<\/td><\/tr><tr><td>2019<\/td><td>Construction commenced<\/td><\/tr><tr><td>2020<\/td><td>2,560 hectares acquired<\/td><\/tr><tr><td>2021<\/td><td>Contractors appointed<\/td><\/tr><tr><td>2023<\/td><td>Eight-lane provision announced<\/td><\/tr><tr><td>2024<\/td><td>The Karnataka stretch opened<\/td><\/tr><tr><td>2026<\/td><td>Expected full completion (July)<\/td><\/tr><\/tbody><\/table><\/figure>\n<!-- \/wp:table -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Toll Charges on the Chennai Bangalore Expressway<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p><strong>Cars and Jeeps<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:table -->\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Trip Type<\/strong><\/td><td><strong>Toll (INR)<\/strong><\/td><\/tr><tr><td>One-way<\/td><td>185\u2013190<\/td><\/tr><tr><td>Same-day return<\/td><td>275\u2013280<\/td><\/tr><tr><td>Monthly pass (50 trips)<\/td><td>6,105\u20136,260<\/td><\/tr><\/tbody><\/table><\/figure>\n<!-- \/wp:table -->\n\n<!-- wp:paragraph -->\n<p>Heavy vehicles may pay a toll fee, which amounts to INR 635 for a one-way trip and INR 955 for a round trip.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><strong>The toll plazas can be found at these locations:<\/strong><\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>Hedigenabele<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>Agrahara<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>Krishnarajapura<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>Sundarapalya<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Real Estate and Economic Impact<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3 class=\"wp-block-heading\"><strong>Sriperumbudur<\/strong><\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>Sale prices: INR 3,500 \u2013 5,500 per sq. ft.<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>Rentals: INR 8 \u2013 15 per sq. ft.<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3 class=\"wp-block-heading\"><strong>Hoskote &amp; Devanahalli<\/strong><\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>The proposed cloverleaf interchange, together with its connectivity plan, will increase the need for both residential and plotted development projects.&nbsp;<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>The corridor's ribbon development will create two major impacts, which include:<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:list -->\n<ul class=\"wp-block-list\"><!-- wp:list-item -->\n<li>Industrial expansion<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>Employment creation<br><\/li>\n<!-- \/wp:list-item -->\n\n<!-- wp:list-item -->\n<li>Stable rental demand<\/li>\n<!-- \/wp:list-item --><\/ul>\n<!-- \/wp:list -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>Future Expansion Plans<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>The expressway will be expanded to Mangaluru after its construction ends, which will improve east-west transportation links throughout southern India, according to MoRTH and NHAI regulations.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>Overall, the Chennai Bangalore Expressway serves as an infrastructure project which will transform South Indian transportation systems, economic development and urban expansion. The expressway will become a major transportation corridor in India because it combines fast travel with safe operation and important roadway connections.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading -->\n<h2 class=\"wp-block-heading\"><strong>FAQ\u2019s<\/strong><\/h2>\n<!-- \/wp:heading -->\n\n<!-- wp:yoast\/faq-block {\"questions\":[{\"id\":\"faq-question-1770618868441\",\"question\":[\"Q1. Is the Chennai Bangalore Expressway open?\"],\"answer\":[\"The Karnataka section, which measures approximately 71 kilometers is currently active while construction work continues on the rest of the project, which will reach its complete operational status in July 2026.\"],\"jsonQuestion\":\"Q1. Is the Chennai Bangalore Expressway open?\",\"jsonAnswer\":\"The Karnataka section, which measures approximately 71 kilometers is currently active while construction work continues on the rest of the project, which will reach its complete operational status in July 2026.\"},{\"id\":\"faq-question-1770618945031\",\"question\":[\"Q2. Which two cities will the Bangalore Chennai Expressway connect?\"],\"answer\":[\"The route provides a connection between Bengaluru through Hoskote and Chennai through Sriperumbudur.\"],\"jsonQuestion\":\"Q2. Which two cities will the Bangalore Chennai Expressway connect?\",\"jsonAnswer\":\"The route provides a connection between Bengaluru through Hoskote and Chennai through Sriperumbudur.\"},{\"id\":\"faq-question-1770618980562\",\"question\":[\"Q3. What is the length of Chennai Bangalore Expressway ?\"],\"answer\":[\"The Chennai Bangalore Expressway extends for a distance of about 258 kilometres.\"],\"jsonQuestion\":\"Q3. What is the length of Chennai Bangalore Expressway ?\",\"jsonAnswer\":\"The Chennai Bangalore Expressway extends for a distance of about 258 kilometres.\"},{\"id\":\"faq-question-1770619023615\",\"question\":[\"Q4. Where to enter Bangalore Chennai Expressway?\"],\"answer\":[\"The main points of entry into the area are situated at Hoskote, which is close to Bengaluru and at Sriperumbudur, which is near Chennai, together with specific interchanges that are distributed throughout the entire route.\"],\"jsonQuestion\":\"Q4. Where to enter Bangalore Chennai Expressway?\",\"jsonAnswer\":\"The main points of entry into the area are situated at Hoskote, which is close to Bengaluru and at Sriperumbudur, which is near Chennai, together with specific interchanges that are distributed throughout the entire route.\"},{\"id\":\"faq-question-1770619050038\",\"question\":[\"Q5. What are the toll charges on the Chennai Bangalore Expressway?\"],\"answer\":[\"In the Karnataka stretch, cars and jeeps must pay toll fees that begin at approximately \u20b9185 to \u20b9190 for a single journey, while larger vehicles and those using return trips or monthly passes must pay higher toll rates.\"],\"jsonQuestion\":\"Q5. What are the toll charges on the Chennai Bangalore Expressway?\",\"jsonAnswer\":\"In the Karnataka stretch, cars and jeeps must pay toll fees that begin at approximately \u20b9185 to \u20b9190 for a single journey, while larger vehicles and those using return trips or monthly passes must pay higher toll rates.\"}]} -->\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1770618868441\"><strong class=\"schema-faq-question\">Q1. Is the Chennai Bangalore Expressway open?<\/strong> <p class=\"schema-faq-answer\">The Karnataka section, which measures approximately 71 kilometers is currently active while construction work continues on the rest of the project, which will reach its complete operational status in July 2026.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1770618945031\"><strong class=\"schema-faq-question\">Q2. Which two cities will the Bangalore Chennai Expressway connect?<\/strong> <p class=\"schema-faq-answer\">The route provides a connection between Bengaluru through Hoskote and Chennai through Sriperumbudur.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1770618980562\"><strong class=\"schema-faq-question\">Q3. What is the length of Chennai Bangalore Expressway ?<\/strong> <p class=\"schema-faq-answer\">The Chennai Bangalore Expressway extends for a distance of about 258 kilometres.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1770619023615\"><strong class=\"schema-faq-question\">Q4. Where to enter Bangalore Chennai Expressway?<\/strong> <p class=\"schema-faq-answer\">The main points of entry into the area are situated at Hoskote, which is close to Bengaluru and at Sriperumbudur, which is near Chennai, together with specific interchanges that are distributed throughout the entire route.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1770619050038\"><strong class=\"schema-faq-question\">Q5. What are the toll charges on the Chennai Bangalore Expressway?<\/strong> <p class=\"schema-faq-answer\">In the Karnataka stretch, cars and jeeps must pay toll fees that begin at approximately \u20b9185 to \u20b9190 for a single journey, while larger vehicles and those using return trips or monthly passes must pay higher toll rates.<\/p> <\/div> <\/div>\n<!-- \/wp:yoast\/faq-block -->","_et_gb_content_width":"","footnotes":""},"categories":[74],"tags":[],"class_list":["post-2229","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-public-infrastructure"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Chennai Bangalore Expressway: Route, Map, Connectivity &amp; More<\/title>\n<meta name=\"description\" content=\"Explore the Chennai Bangalore Expressway route, map, connectivity benefits, travel time reduction, and its impact on growth and real estate.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chennai Bangalore Expressway: Route, Map, Connectivity &amp; More\" \/>\n<meta property=\"og:description\" content=\"Explore the Chennai Bangalore Expressway route, map, connectivity benefits, travel time reduction, and its impact on growth and real estate.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/\" \/>\n<meta property=\"og:site_name\" content=\"Total Environment\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-09T09:31:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-09T09:31:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Diksha Arora\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Diksha Arora\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/\"},\"author\":{\"name\":\"Diksha Arora\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/person\/c704f8f3d883054aa0ed742af5e2290d\"},\"headline\":\"Chennai Bangalore Expressway: Route, Map, Connectivity &amp; More\",\"datePublished\":\"2026-02-09T09:31:28+00:00\",\"dateModified\":\"2026-02-09T09:31:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/\"},\"wordCount\":1355,\"publisher\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp\",\"articleSection\":[\"Public Infrastructure\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/\",\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/\",\"name\":\"Chennai Bangalore Expressway: Route, Map, Connectivity & More\",\"isPartOf\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp\",\"datePublished\":\"2026-02-09T09:31:28+00:00\",\"dateModified\":\"2026-02-09T09:31:30+00:00\",\"description\":\"Explore the Chennai Bangalore Expressway route, map, connectivity benefits, travel time reduction, and its impact on growth and real estate.\",\"breadcrumb\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618868441\"},{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618945031\"},{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618980562\"},{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619023615\"},{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619050038\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#primaryimage\",\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp\",\"contentUrl\":\"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp\",\"width\":1200,\"height\":630,\"caption\":\"Chennai Bangalore Expressway\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/totalenvironmentindia.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Chennai Bangalore Expressway: Route, Map, Connectivity &amp; More\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#website\",\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/\",\"name\":\"Total Environment\",\"description\":\"Environment Projects\",\"publisher\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#organization\",\"name\":\"Total Environment\",\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/wp-content\/uploads\/2022\/10\/logo-scaled.webp\",\"contentUrl\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/wp-content\/uploads\/2022\/10\/logo-scaled.webp\",\"width\":2560,\"height\":304,\"caption\":\"Total Environment\"},\"image\":{\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/person\/c704f8f3d883054aa0ed742af5e2290d\",\"name\":\"Diksha Arora\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e86cd8bf44891172d9c94a386922cdb9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e86cd8bf44891172d9c94a386922cdb9?s=96&d=mm&r=g\",\"caption\":\"Diksha Arora\"},\"sameAs\":[\"https:\/\/www.totalenvironmentindia.com\/\"],\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/author\/dikshaarora\/\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618868441\",\"position\":1,\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618868441\",\"name\":\"Q1. Is the Chennai Bangalore Expressway open?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Karnataka section, which measures approximately 71 kilometers is currently active while construction work continues on the rest of the project, which will reach its complete operational status in July 2026.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618945031\",\"position\":2,\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618945031\",\"name\":\"Q2. Which two cities will the Bangalore Chennai Expressway connect?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The route provides a connection between Bengaluru through Hoskote and Chennai through Sriperumbudur.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618980562\",\"position\":3,\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618980562\",\"name\":\"Q3. What is the length of Chennai Bangalore Expressway ?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Chennai Bangalore Expressway extends for a distance of about 258 kilometres.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619023615\",\"position\":4,\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619023615\",\"name\":\"Q4. Where to enter Bangalore Chennai Expressway?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The main points of entry into the area are situated at Hoskote, which is close to Bengaluru and at Sriperumbudur, which is near Chennai, together with specific interchanges that are distributed throughout the entire route.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619050038\",\"position\":5,\"url\":\"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619050038\",\"name\":\"Q5. What are the toll charges on the Chennai Bangalore Expressway?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"In the Karnataka stretch, cars and jeeps must pay toll fees that begin at approximately \u20b9185 to \u20b9190 for a single journey, while larger vehicles and those using return trips or monthly passes must pay higher toll rates.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chennai Bangalore Expressway: Route, Map, Connectivity & More","description":"Explore the Chennai Bangalore Expressway route, map, connectivity benefits, travel time reduction, and its impact on growth and real estate.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/","og_locale":"en_US","og_type":"article","og_title":"Chennai Bangalore Expressway: Route, Map, Connectivity & More","og_description":"Explore the Chennai Bangalore Expressway route, map, connectivity benefits, travel time reduction, and its impact on growth and real estate.","og_url":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/","og_site_name":"Total Environment","article_published_time":"2026-02-09T09:31:28+00:00","article_modified_time":"2026-02-09T09:31:30+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp","type":"image\/webp"}],"author":"Diksha Arora","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Diksha Arora","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#article","isPartOf":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/"},"author":{"name":"Diksha Arora","@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/person\/c704f8f3d883054aa0ed742af5e2290d"},"headline":"Chennai Bangalore Expressway: Route, Map, Connectivity &amp; More","datePublished":"2026-02-09T09:31:28+00:00","dateModified":"2026-02-09T09:31:30+00:00","mainEntityOfPage":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/"},"wordCount":1355,"publisher":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#organization"},"image":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#primaryimage"},"thumbnailUrl":"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp","articleSection":["Public Infrastructure"],"inLanguage":"en-US"},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/","url":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/","name":"Chennai Bangalore Expressway: Route, Map, Connectivity & More","isPartOf":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#primaryimage"},"image":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#primaryimage"},"thumbnailUrl":"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp","datePublished":"2026-02-09T09:31:28+00:00","dateModified":"2026-02-09T09:31:30+00:00","description":"Explore the Chennai Bangalore Expressway route, map, connectivity benefits, travel time reduction, and its impact on growth and real estate.","breadcrumb":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618868441"},{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618945031"},{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618980562"},{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619023615"},{"@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619050038"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#primaryimage","url":"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp","contentUrl":"https:\/\/totalenvironmentindia.com\/blog\/wp-content\/uploads\/2026\/02\/Chennai-Bangalore-Expressway-Route-Map-Connectivity-More.webp","width":1200,"height":630,"caption":"Chennai Bangalore Expressway"},{"@type":"BreadcrumbList","@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/totalenvironmentindia.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Chennai Bangalore Expressway: Route, Map, Connectivity &amp; More"}]},{"@type":"WebSite","@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#website","url":"https:\/\/totalenvironmentindia.com\/blog\/blog\/","name":"Total Environment","description":"Environment Projects","publisher":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/totalenvironmentindia.com\/blog\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#organization","name":"Total Environment","url":"https:\/\/totalenvironmentindia.com\/blog\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/totalenvironmentindia.com\/blog\/blog\/wp-content\/uploads\/2022\/10\/logo-scaled.webp","contentUrl":"https:\/\/totalenvironmentindia.com\/blog\/blog\/wp-content\/uploads\/2022\/10\/logo-scaled.webp","width":2560,"height":304,"caption":"Total Environment"},"image":{"@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/person\/c704f8f3d883054aa0ed742af5e2290d","name":"Diksha Arora","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/totalenvironmentindia.com\/blog\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e86cd8bf44891172d9c94a386922cdb9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e86cd8bf44891172d9c94a386922cdb9?s=96&d=mm&r=g","caption":"Diksha Arora"},"sameAs":["https:\/\/www.totalenvironmentindia.com\/"],"url":"https:\/\/totalenvironmentindia.com\/blog\/author\/dikshaarora\/"},{"@type":"Question","@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618868441","position":1,"url":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618868441","name":"Q1. Is the Chennai Bangalore Expressway open?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The Karnataka section, which measures approximately 71 kilometers is currently active while construction work continues on the rest of the project, which will reach its complete operational status in July 2026.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618945031","position":2,"url":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618945031","name":"Q2. Which two cities will the Bangalore Chennai Expressway connect?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The route provides a connection between Bengaluru through Hoskote and Chennai through Sriperumbudur.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618980562","position":3,"url":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770618980562","name":"Q3. What is the length of Chennai Bangalore Expressway ?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The Chennai Bangalore Expressway extends for a distance of about 258 kilometres.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619023615","position":4,"url":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619023615","name":"Q4. Where to enter Bangalore Chennai Expressway?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The main points of entry into the area are situated at Hoskote, which is close to Bengaluru and at Sriperumbudur, which is near Chennai, together with specific interchanges that are distributed throughout the entire route.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619050038","position":5,"url":"https:\/\/totalenvironmentindia.com\/blog\/chennai-bangalore-expressway\/#faq-question-1770619050038","name":"Q5. What are the toll charges on the Chennai Bangalore Expressway?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"In the Karnataka stretch, cars and jeeps must pay toll fees that begin at approximately \u20b9185 to \u20b9190 for a single journey, while larger vehicles and those using return trips or monthly passes must pay higher toll rates.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/posts\/2229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/comments?post=2229"}],"version-history":[{"count":4,"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/posts\/2229\/revisions"}],"predecessor-version":[{"id":2235,"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/posts\/2229\/revisions\/2235"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/media\/2233"}],"wp:attachment":[{"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/media?parent=2229"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/categories?post=2229"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/totalenvironmentindia.com\/blog\/wp-json\/wp\/v2\/tags?post=2229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}